Now the plumbing work begins

The main wall is down, the secondary wall is down but this is just the beginning of turning our boys bedroom into a kitchen!

Today was the first part of the next stage – having the plumbing and gas lines wired in. We also are having additional electric outlets put in.

It’s been a very loud and messy day and I’m so happy that I made arrangements for ds6 and ds18months to be at a camp for this period! They would have been so stressed and frightened of all the noise of the jackhammer and banging, not to mention that an active work zone isn’t a safe place for young children.

Overview of the new kitchen in progress - day 1
Overview of the new kitchen in progress

When I first considered this project, I thought we’d have to move the water lines from the current kitchen across the main living area and through the new kitchen area. Then I wondered if perhaps we could connect it to the bathroom plumbing, which I was told was possible.

The bathroom and laundry room
The bathroom and laundry room – replumbed; gas and water lines also added

That seemed a lot more convenient, but we’d still have to rip up the floor across our home in order to put in a new gas line.

Then ds10 suggested we hook up the new gas lines to our laundry room gas outlet – brilliant! It didn’t occur to me at all  – that boy saved us so much time and work with his idea. So while we’ll need to replace the laundry room and bathroom floor, most of the floor that isn’t in the active work zone will remain intact.

Here’s the hallway leading from the bathroom on the left to the new kitchen area on the right. The new plumbing lines are at the top, the new electric lines are lower down.

renovation - hallway

Now you can see the new kitchen area – there is plumbing for two sinks (red and blue piping); the yellow piping contains the new gas line. To the right you can see the drilled space for one of the new outlets.

renovation - boys room

Obviously there’s nothing left of this as a bedroom for the boys anymore! We moved their bunkbeds (the ones we built almost two years ago) temporarily into the living room and moved the rest of the living room furniture out onto the porch. Good thing we have a large porch!

Three boys sleeping in their relocated bunks
Three boys sound asleep in their relocated bunks in living room

For day two, hopefully the electric outlets will be finished being installed and the plumbing will be completed. I’m planning to take the younger five boys on a day trip to the farm on Kibbutz Chafetz Chaim while this work continues in our absence, but need to make sure the boys’ closet unit is emptied before we leave. I knew we’d need to move it eventually but had hoped to be able to leave it in place a bit longer to minimize the upheaval and having even more stuff not in its place.

For now things are very much in flux and while it’s a necessary part of the process, it’s definitely disconcerting to have so much mess with so many things out of place.

Progress, progress! It’s true in the physical world and it’s true in the physical world that before things improve, they get a lot messier and more uncomfortable first!

Avivah

2 thoughts on “Now the plumbing work begins

  1. Wow! We also took pictures of the underfloor pipework when we did a renovation. Those pictures have saved us twice now from having to dig up the whole floor to fix problems!

  2. Just hoping that all is ok with you and your family, we haven’t heard from you in a while and I just hope you’re all safe.

Leave a Reply

Your email address will not be published. Required fields are marked *

WP-SpamFree by Pole Position Marketing